The complete signage package for JW Marriott Hotel Beijing Dongzhimen was recently manufactured and installed by ZIGO. From the exterior signage guests see when arriving, to the brand identity on the lobby back wall, through guest floor wayfinding, room number plates, and signage for banquet rooms, restaurants, fitness and spa areas, and back-of-house — every sign along the guest journey was produced under one process standard.

The lobby back wall was the most demanding piece. The JW Marriott griffin and the brand name in English and Chinese were built as dimensional letters on a brushed stainless steel backdrop. International hotel brands control logo reproduction down to fine details — the curve of the griffin's wings, the stance of its claws, the weight of the letterforms — and each was checked against the brand standard. The letters are brushed stainless, and the grain direction must be consistent; two letters with mismatched grain give themselves away the moment light hits them. We produced a full-size sample first, got confirmation from both hotel and brand sides, locked the sample, then moved to full production.
The building's signage was organized into several lines. Public area wayfinding, guest floor indicators, and room number plates follow one standard for type size, information hierarchy, and mounting height. Banquet and meeting room plates are a changeable system so the hotel can update content for events. Restaurant and bar menu boards and door plates were specified for grease and humidity. All illuminated signage runs a unified warm color temperature, keeping the lobby and guest floors from drifting into mismatched whites and yellows.

Hotel signage looks fiddly, but the hard part is the word "complete." Hundreds of signs spread across floors built by different contractors — production and installation have to track the fit-out schedule, or you end up in cross-trade chaos. From design development onward we scheduled production against the master timeline with the hotel operator and fit-out teams, and installed in zones and batches, finishing ahead of the opening date.
If you're planning a hotel project and need a complete signage package from exterior to guest room, get in touch. ZIGO has focused on signage manufacturing for nearly 30 years, serving international hotel brands — design development, production, and installation in one place.
Copyright © 2025 by SHENZHEN ZIGO SIGNAGE COMPANY LIMITED Privacy policy